Our Infrastructure

Our Workshop

Area of work place : Total Covered Area :
Office :
6000 Sq.ft.
400 Sq. ft.
Connected Power : 70 Hp
Management Strength : Engineers :
Supervisors:
3
1
Work Force : Fitters :
Welders:
Helpers:
Casual Labour:
8
8
6
As needed
MATERIAL HANDLING & TESTING EQUIPMENTS
Equipments Capacity Quantity
Mechanical Hoist 10.0 M.ton x 9.0 Mtrs. Lift 1
Hydraulic Testing Pump 100 kg./m2 1
X-ray viewer _ 1
Calibrated Measuring Instruments Available
1.     3 meter Measuring tape :     2 nos.
2.     5 meter Measuring tape :     1 no.
3.     Vernier Caliper :                 1 no.
4.     Micrometer (Outside) :     1 no. 0-300 mm
                                       :     1 no. 0-500 mm
        Micrometer (Inside ) :       1 no. 0-500 mm
5.     Digital clamp meter




Further expansion is planned for following additional facilities which will enhance our inhouse manufacturing facilities;
1. Lathe Machine (6'-8' bed Length,
300 mm turning dia. Above bed : 1 no.

2. Shapping machine- 600 / 700 mm
Stroke length. : 1 no.

3. Portable digital hardness tester : 1 no.

4. Small stress relieving furnace
(16-20 m3 vol.) : 1 no.