Our Products - Epoxy Finish Paint

TECHNICAL DATA SHEET
Product Description This is two pack epoxy coating for metal and concrete surfaces . It is Amine / Amide cured coating to be used as top coat.
Recommended Uses Ideally suitable for use in varied conditions as a top coat on suitable Epicor Epoxy Primer .
PRODUCT SPECIFICATION
Mixing Ratio Base : Hardener 2 : 1
Colour All Shades as per customer requirement.
Finish Glossy
Pot Life 6 hrs at 30 �C & 65 % Relative Humidity
Volume Solids 40 % � 3
Flash point More than 24 �C
Recommended DFT 30 � 5 microns per coat
Covering Capacity 12 to 14 sq.mtrs / ltr
(Theoretical) -
Drying Time Surface dry – 1 to 2 hrs at 30 �C & 65 % Relative Humidity
Hard Dry – 8 - 10 hrs max at 30 �C & 65 % Relative Humidity
Fully cured – 7 days
Recoating Time 8 – 10 hrs. at 30 �C & 65 % Relative Humidity
Method of Application Brush / Conventional Spray / Airless Spray
Thinner recommended ‘ Epicor ’ Thinner
Shelf life 12 months under normal storage conditions in original sealed containers.
Surface Preparation Suitably primed surface free from oil , grease , moisture and any other foreign matters.
Remarks 1. Application Data
Method Pressure ( Atm) Nozzle Thinner Thinner volume
Brush - - Epicor Thinner 0 – 5 %
Conventional Spray 3– 4
Epicor Thinner 5 – 10 %
Airless Spray 4 – 5 0.018 inch to 0.025 inch Epicor Thinner 0 – 5 %


2. Don’t use below 10 �C     3. Stir well before and while using.    4. Film thickness other than indicated also possible.    5. Mix 15 mins before use.

Safety Precautions :
Provide sufficient ventilation while working with solvent based paints in confined spaces and stagnant air. Keep the material away from heat , spark and direct flame
Avoid inhalation of solvent vapour or paint mist by using facial mask .Use goggles and gloves to protect against direct contact of paint with skin and eyes. In case of contamination , rinse with fresh running water and seek medical help at once.
Follow local & national safety rules.
Special Comments :
Thinner consumption and actual coverage of paint depends on the site conditions. Stir the paint well before painting and while painting if necessary.
Material should be stored at 30 �C temperature in dry place.