Facilities - Fettling



Fettling activities are carried out in fettling shop seperately.

a) Grinding of extra material, surface cleaning & visual inspection of each casting is done.

b) Welding repairs if required is done by qualified welder only. Welding process is described as special process by TCPL. Records of welding process Qualification (WPR) & Welder qualification record (WQR) revised are kept with validity period.

The Fettling Dept. is equipped with following facilities.

M/S Trimurti Engineer, Kolhapur Make hanger type double door (through door) shot blasting machine. 1 No.
M/S konark heat system make 64 KW electricity heat treatment furnace size 1.8 meters * 1.5 meters * 0.9 meters with PI control with two pin graph recorder, max temp 1200 C 1 No.
M/S Agrofab, Kolhapur
Make 1.5 M.T. oil fired H.T. Furnace of Size 2 meters*1.7 meters*1.3 meters with PI Control two pin graph recorder, max temp 1090 C
1 No.
Swing Frame grinder -
7.5 Hp 2 No.
5.00 Hp 1 No.
3.00 Hp 1 No.
Flexible Shaft Grinder 1 No.
2 HP 2800 RPM 2 No.
3 HP 5500 RPM 1 No.
Pneumatics Pencil grinder 3 No.
600 amp welding rectifier 2 No.
400 amp welding rectifier 1 No.
Pneumatic Chippers 2 No.
Gas Cutting Set 3 No.
Acid pickling tank 1.2'*1'*0.8 Mtrs 1 No.