Piaggio Vehicles Pvt. Ltd, Baramati
This is Extension of existing PT line with new CED Line (Dunk Type) for Passenger Vehicle & Top Coat line modifications.
Project : New CED Line for Passenger Vehicle & Top Coat line modifications.
Plant Capacity : 348 Jobs/Day on 2 Shift Basis (21 Jobs / hrs)
Cube size : 1800mmL x 2685mmW x 2000mmH
Weight/Hanger : 600 Kgs.
Scope undertaken : Design, Engineering, Supply, and Erection & Commissioning
- CED Painting line for 3 Wheeler Passenger Vehicle and parts.
- Oven for CED and cooler
- Hot Water Rinse stage at PT line
- Existing Painting line & Paint Mixing Room equipment up-gradation.
- Required material handling systems including -
1. Conveyors/wagons etc. from PT to CED and Skid Conveyor thereafter.
2. Body mounting line before loading station of PT line
3. Material handling trolleys at PTCED, skids for PTCED process - Utilities like -Chiller units, D.G. set for CED, Air supply units and DM Water treatment plant up-gradation
- Control panels & Plant Automation
- SCADA
Project Status : Completed